VNET Bayin Ulanqab is a operational data center project in Ulanqab, China. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: confident

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

221 MW

Source observation: 2026-05-06

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Satellite imagery shows building 9 has completed all its chillers, with only its roof remaining. Previous building completion timelines would imply this building will be operational by the end of 2026.

  2. Satellite imagery shows four operational buildings (1, 2, 4, 5), and the western part of campus (6, 7, 8, 9) has made significant construction progress. The foundation for the northern part of campus (10, 11) has started.

  3. Building 4 is operational, similarly based on a 3-month fit-out period after structural completion in September, as seen from satellite imagery.

  4. Buildings 2 and 5 are operational, based on a 3-month fit-out period after structural completion in August, as can be seen from satellite imagery. Land clearing for the northern part of campus (buildings 10 and 11) has started.

  5. Satellite imagery shows that in total nine buildings have started construction, with building 1 being the only one operational. Buildings 2 and 5 are structurally complete, and the final roofs for buildings 3 and 4 have begun.

  6. Building 1 is operational, based on a 3-month fit-out period after structural completion in April, as can be seen from satellite imagery.

  7. Satellite imagery shows five buildings (1, 2, 3, 4, 5) under construction. Chillers are in place, but no roof is complete for any building.

  8. Land clearing begins late March, as can be seen in satellite images (eastern part: buildings 1 & 2). VNET officially announces its signing ceremony with the Ulanqab municipal government and Shandong Hi-Speed Holdings.

Location

Bayin, Ulanqab, China

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about VNET Bayin Ulanqab

Where is VNET Bayin Ulanqab?

VNET Bayin Ulanqab is listed at Bayin, Ulanqab, China. The project is in Ulanqab, China.

How much power does VNET Bayin Ulanqab use?

The latest source-backed estimate in this atlas is 221 MW of operating IT capacity, observed for 2026-05-06. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does VNET Bayin Ulanqab use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.