← All infrastructure projects

Operational

Huawei Horinger

Huawei · Hohhot, China

Huawei Horinger is a operational data center project in Hohhot, China. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: confident

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

241.8 MW

Source observation: 2026-07-01

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Building 5 is operational, assuming a 3 month fit out post structural completion, as can be seen via satellite imagery.

  2. Satellite imagery shows buildings 1 and 2 are finished, with landscaping complete.

  3. Satellite imagery shows buildings 4 and 5 are all structurally finished, with landscaping complete.

  4. Three of the six (phase 1) buildings planned across the three zones are operational. One other is near completion, apart from backup generators. The third zone does not have cooling sufficient for AI.

  5. Building 2 is operational, assuming a 3 month fit out post structural completion, as can be seen via satellite imagery.

  6. Building 4 is operational, assuming a 3 month fit out post structural completion, as can be seen via satellite imagery.

  7. Building 1 is operational, assuming a 3 month fit out post structural completion, as can be seen via satellite imagery.

  8. 4 structure complete via satellite imagery

  9. Building 1 is structurally complete, and building 4 is structurally complete apart from some remaining cooling towers. Buildings 2 and 5 have begun construction.

  10. Land clearing begins simultaneously for all three zones (west, north, and south) after an official ceremony. Two of the zones later have the cooling capacity indicative of AI workloads.

Location

Huawei, Horinger, China

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about Huawei Horinger

Where is Huawei Horinger?

Huawei Horinger is listed at Huawei, Horinger, China. The project is in Hohhot, China.

How much power does Huawei Horinger use?

The latest source-backed estimate in this atlas is 241.8 MW of operating IT capacity, observed for 2026-07-01. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does Huawei Horinger use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.

More data centers in China

View all projects in China →