← All infrastructure projects

Operational

Stream Phoenix

Unknown · Goodyear, United States

Stream Phoenix is a operational data center project in Goodyear, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: 0

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

64 MW

Source observation: 2026-05-01

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.

  2. Major construction has finished on AI building 1, and AI building 6 has been expedited, as depicted by satellite imagery.

  3. Construction beginning, as can be seen on satellite. Major renovations on western side of the non AI building (PX1), including adding generators and cooling towers.

Location

2950 S. Litchfield Road

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about Stream Phoenix

Where is Stream Phoenix?

Stream Phoenix is listed at 2950 S. Litchfield Road. The project is in Goodyear, United States.

How much power does Stream Phoenix use?

The latest source-backed estimate in this atlas is 64 MW of operating IT capacity, observed for 2026-05-01. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does Stream Phoenix use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.

More data centers in United States