Microsoft Fairwater Atlanta is a operational data center project in Fayetteville, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: confident

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

636 MW

Source observation: 2026-06-14

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Building 3 and 4 are operational.

  2. Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning. Two new buildings at the campus have shells underway, but we don't know if Microsoft is the tenant for those.

  3. Building 4 roof is complete and all mechanical equipment appears to be installed. However, there is still a lot of construction activity around the building.

  4. Building 1 and 2 are operational. Building 1 looked operational sooner, but the buildings are paired in the Fairwater design. The roof of Building 4 is almost complete, while mechanical equipment is still being installed.

  5. Land clearing begins for southern part (Building 1-2)

Location

1435 Hwy 54 W, Fayetteville, GA 30214

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about Microsoft Fairwater Atlanta

Where is Microsoft Fairwater Atlanta?

Microsoft Fairwater Atlanta is listed at 1435 Hwy 54 W, Fayetteville, GA 30214. The project is in Fayetteville, United States.

How much power does Microsoft Fairwater Atlanta use?

The latest source-backed estimate in this atlas is 636 MW of operating IT capacity, observed for 2026-06-14. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does Microsoft Fairwater Atlanta use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.