← All infrastructure projects

Operational

STACK Infrastructure NVA02

Unknown · Manassas, United States

STACK Infrastructure NVA02 is a operational data center project in Manassas, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: 0

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

85 MW

Source observation: 2026-02-14

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. All buildings have begun construction (with groundwork starting for AI building 6), as depicted by satellite imagery.

  2. Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery (a clear image of this can be seen on July 29 via Google Earth).

  3. Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the news and visible on satellite imagery.

Location

9590 Hornbaker Rd, Manassas, VA 20109

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about STACK Infrastructure NVA02

Where is STACK Infrastructure NVA02?

STACK Infrastructure NVA02 is listed at 9590 Hornbaker Rd, Manassas, VA 20109. The project is in Manassas, United States.

How much power does STACK Infrastructure NVA02 use?

The latest source-backed estimate in this atlas is 85 MW of operating IT capacity, observed for 2026-02-14. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does STACK Infrastructure NVA02 use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.

More data centers in United States

View all projects in United States →