Operational

QTS Richmond 3

Unknown Β· Sandston, United States

QTS Richmond 3 is a operational data center project in Sandston, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI Β· Checked 2026-09-15 Β· Owner confidence: 0

AI data center listed by Epoch AI.

Request water-use information β†’

Estimated operating IT capacity

144 MW

Source observation: 2026-05-14

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Building 2 and 3 are operational, based on the previous entry.

  2. Building 1 is operational, based on the substation being completed earlier and cars in the carpark. Building 2 and 3 are not operational, based on minor construction work at the perimeter and no cars in the carpark, but we expect they will be operational within 3 months. Building 4 has complete chillers and backup generators, while Building 5 has chillers but only a few backup generators - roughly the state of Building 1 on 2025-02-04.

  3. The substation looks complete, but we expect Building 1 still needs commissioning before it is fully operational.

  4. The substation is still under construction, based on a Google Earth image, so we don't think any buildings are operational yet.

  5. Building 1 shell is mostly complete, with some chillers installed on the roof. Building 2 shell is under construction.

  6. Land clearing begins.

Location

3525–3543 Portugee Rd, Sandston, VA 23150

View the surrounding area β†—

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about QTS Richmond 3

Where is QTS Richmond 3?

QTS Richmond 3 is listed at 3525–3543 Portugee Rd, Sandston, VA 23150. The project is in Sandston, United States.

How much power does QTS Richmond 3 use?

The latest source-backed estimate in this atlas is 144 MW of operating IT capacity, observed for 2026-05-14. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does QTS Richmond 3 use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.