Operational
Meta Temple
Meta · Temple, United States
Meta Temple is a operational data center project in Temple, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI · Checked 2026-09-15 · Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information →Estimated operating IT capacity
152 MW
Source observation: 2026-02-24
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this project’s water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Building 3 is under construction. An outline is visible for the building which has similar dimensions to those deployed at the Meta Prometheus site.
Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned completion date in this regulatory filing is 2026-03-01.
Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Space is cleared for Building 3.
The traditional Meta data center has been demolished mid-construction, in favor of Meta's new AI-optimized design.
A traditional H-shaped Meta data center is partially built.
Land clearing begins.
Location
2310 Eberhardt Rd, Temple, TX 76504
View the surrounding area ↗Sources & further reading
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about Meta Temple
Where is Meta Temple?
Meta Temple is listed at 2310 Eberhardt Rd, Temple, TX 76504. The project is in Temple, United States.
How much power does Meta Temple use?
The latest source-backed estimate in this atlas is 152 MW of operating IT capacity, observed for 2026-02-24. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does Meta Temple use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.