Operational
Meta Kuna
Meta Β· Kuna, United States
Meta Kuna is a operational data center project in Kuna, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI Β· Checked 2026-09-15 Β· Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information βEstimated operating IT capacity
152 MW
Source observation: 2026-06-01
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this projectβs water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Building 1 and 2 are operational. The 2nd phase of an offsetting solar array goes online on May 31, 2026. Idaho Public Utilities Comission's approval for this start date notes that "[Meta]βs load is expected to increase so much that it will suffer a capacity deficit in June 2026 if served only by Pleasant Valley Solar 1.1,β A redacted table in the staff comments document suggests the data center's load will continue to increase through August, when it presumably reaches the maximum capacity of both buildings.
Building 1 and 2 look complete from outside, with all electrical and cooling equipment installed. Construction has started on 2 smaller buldings to the north. Meta announced the arrival of the first server rack the following week.
Land clearing begins.
Location
601 Kuna Mora Rd, Kuna ID 83634
View the surrounding area βSources & further reading
- Epoch AI β dataset and methodology β
- Official Pamphlet from Meta β
- Application for Power Purchase Agreement, Pleasant Valley Solar 1Β β
- Application for Power Purchase Agreement, Pleasant Valley Solar 2 β
- Approval to move start date of Solar 2 to May 31, 2026 β
- staff comments β
- Notice of Application for 3rd PPA (Blacks Creek Energy Center) β
- Idaho Statesman: Peak construction reached in March 2025 β
- Idaho Statesman: Expected water usage reported in 2022 β
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about Meta Kuna
Where is Meta Kuna?
Meta Kuna is listed at 601 Kuna Mora Rd, Kuna ID 83634. The project is in Kuna, United States.
How much power does Meta Kuna use?
The latest source-backed estimate in this atlas is 152 MW of operating IT capacity, observed for 2026-06-01. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does Meta Kuna use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.