Operational
Meta Cheyenne
Meta · Cheyenne, United States
Meta Cheyenne is a operational data center project in Cheyenne, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI · Checked 2026-09-15 · Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information →Estimated operating IT capacity
152 MW
Source observation: 2026-07-25
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this project’s water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Both buildings estimated to be operational.
Building 1 shell and cooling looks complete, Building 2 roof almost complete.
Structure for Building 1 and 2 under construction.
Ground is being cleared.
Location
Cheyenne, WY 82007, USA
View the surrounding area ↗Sources & further reading
- Epoch AI — dataset and methodology ↗
- Meta Introduction to the Cheyenne Project ↗
- Fortis Construction announcement ↗
- Press announcement suggesting a 2027 operational date ↗
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about Meta Cheyenne
Where is Meta Cheyenne?
Meta Cheyenne is listed at Cheyenne, WY 82007, USA. The project is in Cheyenne, United States.
How much power does Meta Cheyenne use?
The latest source-backed estimate in this atlas is 152 MW of operating IT capacity, observed for 2026-07-25. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does Meta Cheyenne use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.