Operational
Meta Aiken
Meta · Aiken, United States
Meta Aiken is a operational data center project in Aiken, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI · Checked 2026-09-15 · Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information →Estimated operating IT capacity
142 MW
Source observation: 2026-07-15
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this project’s water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Building 1 and 2 are operational (estimate).
Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect 3 more months needed for commissioning and server installation.
Land clearing begins
Location
7601 State Hwy 105, Trenton, SC 29847, USA
View the surrounding area ↗Sources & further reading
- Epoch AI — dataset and methodology ↗
- Meta Introduction to the Aiken Project ↗
- DPR Construction project page ↗
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about Meta Aiken
Where is Meta Aiken?
Meta Aiken is listed at 7601 State Hwy 105, Trenton, SC 29847, USA. The project is in Aiken, United States.
How much power does Meta Aiken use?
The latest source-backed estimate in this atlas is 142 MW of operating IT capacity, observed for 2026-07-15. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does Meta Aiken use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.