Operational
Google Pryor (North)
Google · Pryor, United States
Google Pryor (North) is a operational data center project in Pryor, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI · Checked 2026-09-15 · Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information →Estimated operating IT capacity
368 MW
Source observation: 2026-09-08
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this project’s water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans.
Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.
The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.
Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).
Building 1 is operational, based on default roof-to-operational time.
Location
4581 Webb St, Pryor, OK 74361
View the surrounding area ↗Sources & further reading
- Epoch AI — dataset and methodology ↗
- Google announces expansion of Pryor facility ↗
- Google 2025 Environmental Report ↗
- News of a 9 exaflop TPUv4 cluster in the Pryor data center, launched in 2022 ↗
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about Google Pryor (North)
Where is Google Pryor (North)?
Google Pryor (North) is listed at 4581 Webb St, Pryor, OK 74361. The project is in Pryor, United States.
How much power does Google Pryor (North) use?
The latest source-backed estimate in this atlas is 368 MW of operating IT capacity, observed for 2026-09-08. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does Google Pryor (North) use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.