← All infrastructure projects

Operational

Google Omaha

Google · Omaha, United States

Google Omaha is a operational data center project in Omaha, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: confident

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

237 MW

Source observation: 2026-06-30

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Building 3 is operational (estimate). Based on there being minimal construction work as of May 15.

  2. Building 3 appears almost complete, with only minimal construction work and equipment remaining. The cooling towers are spaced apart in an unusual way, but there's no obvious sign that more will be installed before operation. Buildings 4 and 5 haven't started construction yet, the cleared land is still empty.

  3. Building 3 has all backup generators in place but they are still being installed. Two cooling towers have fans on them, with more underway. To the south of Building 3, more land has been cleared and there's a new carpark. This suggests another building will soon start construction.

  4. Confident that Building 2 is operational

  5. Confirmation that there's no obvious construction happening for Building 2. Building 3 roof started.

  6. Building 2 is operational, based on it being 8 months since the roof was complete, and surrounding infrastructure looks just completed (finishing the cooling towers).

  7. Building 2 has 3 cooling towers installed.

  8. Building 1 operational, based on it being 6 months after roof was complete, infrastructure looked complete for 5 months.

  9. Land clearing begins.

Location

11110 State St, Omaha, NE 68142

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about Google Omaha

Where is Google Omaha?

Google Omaha is listed at 11110 State St, Omaha, NE 68142. The project is in Omaha, United States.

How much power does Google Omaha use?

The latest source-backed estimate in this atlas is 237 MW of operating IT capacity, observed for 2026-06-30. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does Google Omaha use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.