Operational
CoreWeave Denton TX
CoreWeave · Denton, United States
CoreWeave Denton TX is a operational data center project in Denton, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI · Checked 2026-09-15 · Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information →Estimated operating IT capacity
262 MW
Source observation: 2026-09-01
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this project’s water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Building 8 interior fit-out scheduled to begin. TDLR project TABS2026028247 schedules a $110M interior fit-out of the existing 27,678.22 sq ft Building A as a data hall beginning September 1, 2026.
Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the Q2 2026 Earnings call stating the campus was operational by midyear 2026.
Buildings 1-3 (Denton North) are fully operational running AI (Denton North at 90 MW, Denton South partially running at 41). This is according to an earnings call from this date.
Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery.
Half the campus energized. 67 billable MW are now dedicated to CoreWeave's GPUs across three buildings.
First 8 MW billable tranche dedicated to AI starts running at the site, with another 40 scheduled by the end of the quarter.
Construction start - The Texas Department of Licensing and Regulation reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.
Location
8171 Jim Christal Rd, Denton, TX 76207
View the surrounding area ↗Sources & further reading
- Epoch AI — dataset and methodology ↗
- Core Scientific - CoreWeave Announce 1.2B expansion in Denton, TX ↗
- Core Scientific - Denton Datacenter Official Site ↗
- TMF - Core Scientific Q4 2025 Earnings Transcript ↗
- WSJ - plans to rent to OpenAI ↗
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about CoreWeave Denton TX
Where is CoreWeave Denton TX?
CoreWeave Denton TX is listed at 8171 Jim Christal Rd, Denton, TX 76207. The project is in Denton, United States.
How much power does CoreWeave Denton TX use?
The latest source-backed estimate in this atlas is 262 MW of operating IT capacity, observed for 2026-09-01. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does CoreWeave Denton TX use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.