CoreWeave Chester VA is a operational data center project in Chester, United States. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI · Checked 2026-09-15 · Owner confidence: confident
AI data center listed by Epoch AI.
Request water-use information →Estimated operating IT capacity
82 MW
Source observation: 2026-05-20
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this project’s water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.
Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible. Building 3 hasn't started yet, since the old building is still there.
Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here.
Building 1's second data hall scheduled to come online this month.
Conversion starts at CTP-01 (Building 1). The data center was formerly owned by Capital One, now leased to CoreWeave. Source: https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/
Location
1401 Meadowville Technology Parkway, Chester, VA
View the surrounding area ↗Sources & further reading
- Epoch AI — dataset and methodology ↗
- Chirisa secures $200 million loan to fit out VA Data center for CoreWeave ↗
- Blue Owl-led JV secures $750m to build out data centers for CoreWeave ↗
- Chirisa offers former Capital One data center in Virginia to hyperscalers ↗
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about CoreWeave Chester VA
Where is CoreWeave Chester VA?
CoreWeave Chester VA is listed at 1401 Meadowville Technology Parkway, Chester, VA. The project is in Chester, United States.
How much power does CoreWeave Chester VA use?
The latest source-backed estimate in this atlas is 82 MW of operating IT capacity, observed for 2026-05-20. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does CoreWeave Chester VA use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.