← All infrastructure projects

Operational

Southgate Melbourne

Firmus Β· Melbourne, Australia

Southgate Melbourne is a operational data center project in Melbourne, Australia. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI Β· Checked 2026-09-15 Β· Owner confidence: confident

AI data center listed by Epoch AI.

Request water-use information β†’

Estimated operating IT capacity

41 MW

Source observation: 2026-08-09

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Building 1 is operational (estimate). No additional chip deployment beyond the 18,400 GB300 GPUs has been publicly confirmed, so we continue to report the disclosed capacity allocated to Project Southgate, rather than speculate on further buildout.

  2. Building 1's cooling capacity increased to 53 air-cooled chillers (20 fans each), up from 30 in Oct 2025. This is more than enough for the announced 18,400 GB300 GPUs, but construction does not quite look complete, so we expect another 3 months until it's operational.

  3. Satellite imagery shows 30 fully installed air-cooled chillers (20 fans each) on the roof, with room for many more. In the same month, Firmus reported that Project Southgate's "first stages are under construction in Tasmania and Melbourne". So we don't think the Southgate part of the building is operational yet.

  4. Building 1 site is cleared/vacant land; no construction visible yet (based on Google Earth historical imagery).

Location

Melbourne, Australia β€” street address not verified

View the surrounding area β†—

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about Southgate Melbourne

Where is Southgate Melbourne?

Southgate Melbourne is listed in Melbourne, Australia. A street address has not been verified for this record.

How much power does Southgate Melbourne use?

The latest source-backed estimate in this atlas is 41 MW of operating IT capacity, observed for 2026-08-09. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does Southgate Melbourne use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.