Operational
Oracle Batam
Oracle Β· Batam, Indonesia
Oracle Batam is a operational data center project in Batam, Indonesia. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.
Epoch AI Β· Checked 2026-09-15 Β· Owner confidence: likely
AI data center listed by Epoch AI.
Request water-use information βEstimated operating IT capacity
72 MW
Source observation: 2026-05-06
Site water use
Not yet verified
No site-level value published in this atlas
Local water stress
Not yet assessed
Regional context has not been added
From information to action
Ask about this projectβs water use.
Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.
A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.
Read and edit the request
Opening a draft does not send an email. Review it in your email app before sending.
Project timeline
Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.
The three buildings look unchanged since March.
Building 3 is operational. Based on it looking complete as of March, and DayOne posting a video of the facility on this date. In one shot of the video, fan movement is visible for all buildings, suggesting they are all operational.
Building 3 looks complete including building shell, chillers and backup generators.
Building 3 has cooling towers beginning to be installed.
Building 3 shell is partly built. Building 1 and 2 look complete.
Building 1 and 2 are operational. Based on Oracle announcing the Indonesia North (Batam) region is available, and both buildings looking complete soon after, in June.
Land clearing begins.
Location
Batam, Indonesia β street address not verified
View the surrounding area βSources & further reading
- Epoch AI β dataset and methodology β
- DayOne discloses a partnership with "leading global tech company" at their Batam campus β
- Oracle announces their Batam cloud compute region β
- Oracle is later reported to be leasing DayOne data centers in Indonesia β
- DayOne video stating 72 MW of IT power and NVIDIA partnership, and showing cooling tower fan movement β
Dataset attribution: Epoch AI, CC BY.
Local context is still being researched
No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.
Contribute local knowledge
Help fill in the picture.
Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.
Frequently asked questions about Oracle Batam
Where is Oracle Batam?
Oracle Batam is listed in Batam, Indonesia. A street address has not been verified for this record.
How much power does Oracle Batam use?
The latest source-backed estimate in this atlas is 72 MW of operating IT capacity, observed for 2026-05-06. This is an estimate of computing capacity, not metered annual electricity consumption.
How much water does Oracle Batam use?
No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.