Microsoft Narvik Norway

Nscale · Bjerkvik, Norway

Microsoft Narvik Norway is a under construction data center project in Bjerkvik, Norway. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI · Checked 2026-09-15 · Owner confidence: likely

AI data center listed by Epoch AI.

Request water-use information →

Estimated operating IT capacity

0 MW

Source observation: 2026-07-05

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Inferred from dated construction notes; completion is not confirmed. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Backup generator concrete pads are there, but no equipment install visible. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

  2. Building 1 cooling looks complete. Backup generator install continues adjacent to B1. Building 2 cooling install continues. Ground prep for generators next to B2. Cooling install appears to continue on Building 3. Construction equipment present all around site. We believe no buildings are operational at this time.

  3. Building 1 starts to go up.

  4. Site prep continues for Buildings 1, 2, and 3.

  5. Land clearing and site prep begins at least as early as July 2023.

Location

Bjerkvik, Norway — street address not verified

View the surrounding area ↗

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about Microsoft Narvik Norway

Where is Microsoft Narvik Norway?

Microsoft Narvik Norway is listed in Bjerkvik, Norway. A street address has not been verified for this record.

How much power does Microsoft Narvik Norway use?

The latest source-backed estimate in this atlas is 0 MW of operating IT capacity, observed for 2026-07-05. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does Microsoft Narvik Norway use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.