DayOne Nusajaya

Unknown Β· Johor Bahru, Malaysia

DayOne Nusajaya is a operational data center project in Johor Bahru, Malaysia. This record brings together its location, estimated IT capacity, construction timeline, water-disclosure gaps and original sources.

Epoch AI Β· Checked 2026-09-15 Β· Owner confidence: 0

AI data center listed by Epoch AI.

Request water-use information β†’

Estimated operating IT capacity

240 MW

Source observation: 2026-04-05

Site water use

Not yet verified

No site-level value published in this atlas

Local water stress

Not yet assessed

Regional context has not been added

How to interpret this record. Epoch reports the site as operational; individual buildings may still be under construction. Capacity is an estimate of IT power, not metered electricity consumption. Sources were collected by Epoch AI; inclusion is not independent verification by our team.

From information to action

Ask about this project’s water use.

Request figures, reporting periods and original documents. Edit the draft to reflect your questions and sign it with your name.

A project-specific public email has not been verified. Copy the request and use an official contact channel from the sources below, or suggest a sourced contact through the contribution form.

Read and edit the request

Opening a draft does not send an email. Review it in your email app before sending.

Project timeline

Source notes reproduced from Epoch AI. Future projections are excluded. Status may have changed since the latest observation.

  1. Buildings 7-10 look mostly complete, but there is still some construction work at the edges.

  2. Buildings 3-6 are operational, based on them looking complete. DayOne reported that 390 MW is "in service" in Johor as of Jan 30. This is across both Nusajaya (including Phase 1, which we don't include here) and Kempas, but Nusajaya is the vast majority of capacity at this time. Building 7 and 8 look almost complete, while Building 9 and 10 shells are still under construction.

  3. Buildings 1-2 are fully operational. Based on DayOne reporting that 120 MW is in operation in Johor, with 50 MW towards these two buildings. The date is based on the earliest available archived webpage, so this may have happened earlier.

  4. Construction for Building 1-2 is underway.

Location

Johor Bahru, Malaysia β€” street address not verified

View the surrounding area β†—

Sources & further reading

Dataset attribution: Epoch AI, CC BY.

Local context is still being researched

No independently reviewed permit summary or community report has been added here. This does not mean there are no permits, concerns or impacts.

Contribute local knowledge

Help fill in the picture.

Suggest a project, correction or local concern. Include a public source so an editor can review it. Reports are private until reviewed; submitting does not change the map.

We store your contribution and source for editorial review. Please share only information you have permission to submit. We do not ask for your name or email.

Frequently asked questions about DayOne Nusajaya

Where is DayOne Nusajaya?

DayOne Nusajaya is listed in Johor Bahru, Malaysia. A street address has not been verified for this record.

How much power does DayOne Nusajaya use?

The latest source-backed estimate in this atlas is 240 MW of operating IT capacity, observed for 2026-04-05. This is an estimate of computing capacity, not metered annual electricity consumption.

How much water does DayOne Nusajaya use?

No verified site-level water withdrawal or consumption figure has been added to this atlas. A missing figure means the value is not verified here, not that the project uses no water.